Skip to content
Red Planet Global Concepts Limited

Healthcare

Sub-Saharan Africa's Leading Healthcare Infrastructure Solutions Partner

Medical Supply · Medical Consultancy · Biomedical Engineering

We do not just supply medical equipment. We architect complete healthcare ecosystems, from facility design through biomedical engineering and 24/7 emergency support.

Clinical equipment in a hospital critical care unit

Healthcare Excellence Requires Premium Standards

Healthcare is life-critical. Every engagement carries uncompromising quality, regulatory precision, and long-term commitment. The integrated model of supply, consultancy, and biomedical engineering is what lets one team carry a hospital project from feasibility study to a signed maintenance agreement.

Three integrated divisions

  • Surgical and operating theatre consumables
  • Infection control and PPE
  • Diagnostic and laboratory reagents
  • Patient care and general hospital supplies
  • GDP-certified cold chain with IoT temperature telemetry
  • Emergency dispatch for urgent supply needs
  • Hospital planning and feasibility studies
  • Clinical facility design and workflow layout
  • Medical technology assessment and life-cycle audits
  • Quality accreditation and clinical governance
  • Healthcare workforce capacity building
  • Diagnostic imaging systems
  • ICU and critical care equipment
  • Operating theatre systems
  • Laboratory and sterilisation infrastructure
  • Installation, commissioning, and staff training
  • Preventative maintenance and 24/7 emergency repair

Equipment portfolio

End-to-end project lifecycle

Complex hospital installations run under a single accountable management umbrella, from first site visit to an active service agreement.

  1. 01

    Needs analysis

    Site assessment, clinical workflow mapping, infrastructure readiness audit covering power, HVAC, and radiation shielding, and financial budgeting.

  2. 02

    Specification and design

    Technical specification customisation, optimal OEM platform selection, architectural CAD planning, and bill of quantities.

  3. 03

    Procurement and shipping

    Direct OEM order placement, factory acceptance testing at the manufacturer, international freight, customs clearance, and secure warehousing in transit.

  4. 04

    Civil works and installation

    Room preparation including lead lining, epoxy flooring, and electrical stabilisation. Equipment positioning, utilities connection, and system integration.

  5. 05

    Testing and staff training

    System calibration and safety checks, clinical application training for medical staff, technical handoff to local engineers, and documentation.

  6. 06

    SLA and life-cycle management

    Warranty activation, scheduled preventative maintenance visits, continuous software updates, and consumable replenishment.

Support after installation

Installation and commissioning
On-site installation by certified technicians, acceptance testing to OEM specification, and clinical staff training before handover.
Preventative maintenance contracts
Quarterly or bi-annual scheduled visits, proactive component replacement ahead of failure, and performance optimisation checks.
24/7 emergency repair
Emergency hotline with a guaranteed response under 4 hours within Lagos State and 24 hours nationwide, with backup equipment rental during repairs.
Local spare parts warehousing
Genuine replacement parts, motherboards, circuit boards, and transducers stocked in Lagos, removing months-long import delays on a failed component.
Intensive care unit bay with ventilator and patient monitoring equipment

Project record

40-bed ICU and theatre modernisation

Specialist healthcare facility, Lagos

Complete modernisation and equipping of a 40-bed intensive care unit and three operating theatres.

  • Architectural spatial review with HVAC and medical gas line integration design
  • Supply and installation of 12 ICU ventilators and multi-parameter monitors
  • LED theatre lighting and surgical tables across three theatres
  • Clinical application training for 35 nurses and 8 anaesthesiologists
  • Three-year comprehensive maintenance agreement with quarterly preventative visits

Commissioned two weeks ahead of schedule, with zero downtime recorded across the first 24 months of continuous operation.

Quality and regulatory alignment

Every medical device imported and installed undergoes pre-dispatch testing and post-installation validation prior to final clinical sign-off.

NAFDAC
National Agency for Food and Drug Administration and Control. Medical device registration and chemical import compliance.
ISO 13485
Medical Devices Quality Management Systems. Internal quality processes mapped to the standard.
NNRA
Nigerian Nuclear Regulatory Authority. Radiation safety for X-ray, CT, and emitting equipment installation.

Schedule a healthcare consultation

Facility planning, equipment specification, or biomedical support. Tell us where the project stands.

Start an inquiry